Leak
Remediation Project
- Dec. 3, 2011 Town Hall meeting with Stonemark Construction Management in UCSB Bldg 594 (Sat. 10am-noon):
- Feasibility report by Stonemark Construction Management (19 page pdf) on 3 project scopes, including budgets, July 18, 2011 version (originally prepared June 7; subsequently modified to $7.135 million, not including financing of wooden door leaves) . The bottom lines: $11.75 mio for full remediation; $8.68 mio. for a recommended scope.
- Final
Working Drawings for Units 917 & 918 - February 18, 2010
Final architectural drawings and bid documents from HH Fremer Architects.
The University
will use these documents as the basis for soliciting bids from contractors.
- WCPHOA
Comments on Working Drawings with UCSB Responses - July 2, 2009
A compilation of all the outstanding comments by the WCPHOA with responses
by UCSB.
- Overview
of Working Drawings for Units 917 & 918 - April 27, 2009
- A descriptive overview of the working drawings that highlights critical
issues with the major elements of the plans. (Prepared by Harry Nelson
and John Woolley.)
- Working
Drawings for Units 917 & 918 - April 14, 2009
Architectural drawings from HH Fremer Architects for the remediation
of Units 917 & 918. These drawings are between 50% and 75% complete.
They have been provided for our review so we can offer comments to HH
Fremer Architects before the drawings are completed.
- Master
List of Leak Remediation Project Issues - February 26, 2009
List of issues that have been raised during the project, color-coded
by status.
Updated version of October 2008 list.
- Roofing Options Survey Results
- 12/5/2008
The results of the WCO Roofing Options Survey are in. Click the link
below to review the results.
- Master List of
Leak Remediation Project Issues - October, 2008
List of issues that have been raised during the project, color-coded
by status.
- HH
Fremer Architects: anwers to questions - August 3, 2007
Responses to questions asked by homeonwers
- Presentation
to the Chancellor by the WCP Board - March 13, 2007
PowerPoint presentation including project background, history of leaks,
photographs, and information about housing valuation.
(4 MB file. Right
click link and select Save to download for much faster viewing. Click here to download
the presentation separated into in four smaller files.)
- Leak Repair History
1986 - 2007 - March 2007
Chronology of leak reports and attempts to fix them.
- Leak Location Charts
- December 2006 & March 2007
Charts illustrating location of leaks prepared by Mark Vanderslice based
on 2006 homewoner survey
- Reconstruction
Recommendations from Mark Vanderslice, Roofing Forensics - December
2006
6 page report based on 2006 survey of homeowners and destructive testing
of Unit #917
Photos by Mark Vanderslice
To view photos taken by Mark Vaderslice of Roofing Forensics during the
destructive testing of Unit 917 in 2006, visit the Vanderslice
Photo Album.
|